Factory-direct sourcing saves a salon real money per bundle, but it introduces a delay that local distributors do not have. That delay is manageable with planning, and unmanaged it shows up as the worst possible outcome: a confirmed booking on the calendar with no material in the store room.
1. Lead Time vs the Booking Calendar
Work backwards from the calendar rather than forwards from the store room. Identify the busiest stretch of the coming period, estimate material consumption for the bookings already held, and set the order date so the shipment lands before that stretch begins rather than during it. Add a buffer for the payment and documentation steps, which often run longer than the production step and are the usual reason a shipment slips.
2. Setting the Reorder Trigger
A trigger expressed as a number of bundles on hand is more reliable than a monthly habit, because consumption is not evenly spread. Set the trigger at the level that covers consumption across the full lead time plus a safety margin, and recalculate it whenever lead times change or a large booking is added. Recalculating the trigger is a five-minute task; discovering the shortage on a Saturday morning is not.
3. Keeping Two Supply Paths Open
Even a well-planned factory-direct pipeline benefits from a small local fallback for emergencies, used deliberately and rarely. Reserve the fallback for confirming a booking that would otherwise be rescheduled, and record every use so the trigger level can be adjusted if emergencies start recurring. A fallback that is used routinely is not a fallback, it is a signal that the lead time assumption was set too tight.